Application Documents – October 2023
Volume 1 – Written Statement
- Environmental Report Volume 1 Written Statement (chapters 1 – 7)
- Environmental Report Volume 1 Written Statement (chapters 8 -16)
Volume 2 – Figures and Visualisations
- Volume 2 Figures and Visualisations Contents Page
- Figure 2.1 Geographical Context
- Figure 2.2 The Site in Detail
- Figure 3.1 Pre Scoping Layout
- Figure 3.2 Scoping Layout
- Figure 3.3 Two Turbine and Battery Layout
- Figure 3.4 Initial Battery Facility Layout
- Figure 3.5 Final BESS Layout
- Figure 4.1 Overall Proposed Development Layout
- Figure 4.2 Indicative BESS Layout
- Figure 4.3 Typical Energy Storage Unit
- Figure 4.4 Ind Switch & Control Elevation
- Figure 4.5 Indicative Fence Details
- Figure 4.6 Proposed Access Track Cross-Section
- Figure 4.7 Indicative Landscape Scheme
- Figure 5.1 Forestry Study Area
- Figure 5.2 Baseline Species Plan
- Figure 5.3 Proposed Development Felling Plan
- Figure 5.4 Proposed Development Restocking Species and Habitat Plan
- Figure 6.1 – Site Location and Study Area
- Figure 6.2 – Screened ZTV with Viewpoints
- Figure 6.3 – Landscape Character Types
- Figure 6.4 – Landscape Character Types with SZTV and Viewpoints
- Figure 6.5 – Topography
- Figure 6.6 – Local Context
- Figure 6.7 Viewpoint 1 – A9, Mybster Substation
- Figure 6.8 Viewpoint 2 – B870 near Achnamoine
- Figure 6.9 Viewpoint 3 – B870 near Toftingall Farm
- Figure 6.10 Viewpoint 4 – Toftingall forest track near northern boundary
- Figure 6.11 Viewpoint 5 – Toftingall forest track south of Knockglass
- Figure 6.12 Viewpoint 6 – Haul road to Mybster Substation
- Figure 6.13 Viewpoint 7 – Halsary Wind Farm access track
- Figure 6.14 Landscape Masterplan
- Figure 6.15 a – c Viewpoint 1 Visualisations
- Figure 7.1 – Designated Sites within 5 km
- Figure 7.2 – Protected Species – Desk Based
- Figure 7.3 – Habitat Survey Results
- Figure 7.4 – Protected Species Survey Results
- Figure 7.5 – Static Bat Detector Locations
- Figure 8.1 Survey Locations and Buffers
- Figure 8.2 Reporting Areas
- Figure 9.1 Known Heritage Assets within 1km Study Area
- Figure 10.1 Superficial Soils
- Figure 10.2 Solid Geology
- Figure 10.3 National Soils Map of Scotland
- Figure 10.4 Carbon and Peatland Map 2016
- Figure 10.5 Interpolated Peat Depths
- Figure 11.1 Core Study Area and Wider Study Area
- Figure 11.2 Surface Hydrology
- Figure 11.3 Private Water Supplies
- Figure 11.4 SEPA – Infrastructure and Watercourse Buffers
- Figure 12.1 BESS and Substation Noise Contours
- Figure 13.1 General Construction Traffic Route to Site
- Figure 13.2 Traffic Count Locations
- Figure 13.3 Traffic and Transport Road Traffic Collision (RTC) Assessment
Volume 3 – Appendices
- Volume 3 Appendices Contents Page
- Appendix 6.1 – LVIA Assessment Criteria
- Appendix 6.2 – Viewpoint Assessment
- Appendix 7.1 Bat Survey Report
- Appendix 7.2 Outline Habitat Management Plan
- Appendix 8.1 – Ornithology Technical Report
- Appendix 9.1 Archaeological Desk Based Assessment
- Appendix 10.1 – Figure 10.1.8 Factor of Safety Plan
- Appendix 10.1 – Figure 10.1.1 Site Layout Plan
- Appendix 10.1 – Figure 10.1.2 Superficial Soils
- Appendix 10.1 – Figure 10.1.3 Solid Geology
- Appendix 10.1 – Figure 10.1.4 Geomorphology Map
- Appendix 10.1 – Figure 10.1.5 Recorded Peat Depths
- Appendix 10.1 – Figure 10.1.6 Interpolated Peat Depths
- Appendix 10.1 – Figure 10.1.7 Slope Map
- Appendix 10.1 – Figure 10.1.8 Factor of Safety Plan
- Appendix 10.1 – Figure 10.1.9 Hazard Rank Zonation Plan
- Appendix 10.2 Outline Peat Management Plan
- Appendix 10.2 – Figure 10.2.1 Site Layout Plan
- Appendix 10.2 – Figure 10.2.2 Superficial Soils
- Appendix 10.2 – Figure 10.2.3 Solid Geology
- Appendix 10.2 – Figure 10.2.4 Recorded Peat Depths (1)
- Appendix 10.2 – Figure 10.2.5 Interpolated Peat Depths
- Appendix 10.2 – Figure 10.2.6 Temporary Peat Storage Areas
- Appendix 11.1 Outline Water Construction Environment Management Plan
- Appendix 11.2 – Outline Feasibility Surface Water Drainage Strategy
Application Drawings
- Site Location Plan Ordnance Survey Location Plan
- Overall Proposed Development Layout
- Proposed Access Track Cross-Section Detail
- 17959_DET_3000 – REVA – INDICATIVE 20ft BATTERY PCS TRANSFORMER UNIT LAYOUT
- 17959_DET_3001 – REVA – INDICATIVE BATTERY FOUNDATIONS PLAN AND SECTIONS
- 17959_DET_3002 – REVA – INDICATIVE FENCE DETAIL
- 17959_LAY_1002 – REVD – SUBSTATION & BESS LAYOUT
- 17959_LAY_1003 – REVC – SUBSTATION & BESS ELEVATIONS
- 17959_LAY_1004 – REVB – SUBSTATION BUILDING ELEVATIONS
- 17959_LAY_1100 – REVA – PLATFORM EARTHWORKS DRAWING
Design and Access Statement and Planning Statement
Pre-Application Consultation Report
-
- Appendix 1 Proposal of Application Notice Form Loch Toftingall 20221209
- Appendix 2 Stakeholder Correspondence
- Appendix 3 COD Invitation postcards
- Appendix 4 COD Information Panels
- Appendix 5 COD Photographs
- Appendix 6 COD press coverage and media adverts
- Appendix 7 COD Questionnaire samples
- Appendix 8 COD Enquiry Form
- Appendix 9 Returned COD Questionnaires redacted
- Appendix 10 SP=EED Practical Guide to Engagement in Planning
Scoping Report
Loch Toftingall Scoping Report
Community Open Day 2 Information Panels – March 2023
- Welcome
- Proposed Development
- Layout 1
- Layout 2
- Layout 3
- Environmental Impact Assessment (EIA)
- Environmental Surveys
- Landscape and Visual Impact Assessment
- Next steps
- Community
Community Open Day 1 Information Panels – January 2023